Bond Scope

Bond Scope - $28,220,000

Elementary Renovations

  • ADA & life safety code-compliance upgrades

    • Includes incorporation and/or upgrade of existing fire suppression and alert systems.

    • Includes restroom upgrades and reconfiguration

  • Moisture mitigation as required.

  • Structural remediation as required.

  • Roofing remediation as required

    • Includes replacement of existing gutters and roof edge flashing where needed.

    • Includes replacement and flashing of rooftop air conditioning curbs where required

  • Replacement and upgrade of interior finishes including resilient flooring, floor & wall tile, and ceiling treatments.

    • Includes replacement of interior lighting with code-compliant high-efficiency fixtures.

  • New elementary classroom and elementary admin furniture

  • Repartitioning of elementary classroom wing.

    • Includes the removal and replacement of 70%-80% of existing interior non-loadbearing wall construction to allow for right-sizing of classroom space per TEA guidelines, general code compliance, and reconfiguration of interior circulation.

    • Repartitioning also includes upgrades to existing elementary wing secure vestibule and admin area.

  • Replacement and upgrade of MEP systems as required,

    • Includes water heaters, rooftop air conditioning units, and any other existing systems needed.

  • Replacement and upgrade of exterior fenestration/window systems for energy efficiency.

  • Exterior paving improvements at elementary facilities

New Cafeteria including Stage & Storm Shelter

  • Cafeteria and kitchen space attached to existing elementary wing.

    • Includes new interior corridor connection to existing elementary wing.

  • New storm shelter space attached to existing elementary wing

    • Code required storm shelter will be sized to accommodate all students, staff, faculty, and admin for elementary and secondary schools on site.

  • Existing cafeteria security renovations

    • Provides new secure vestibule at secondary school entry

    • Provides new front office space attached to secure vestibule

    • Provides new classrooms as space allows given above priorities are met.

  • Exterior paving access and service yard facilities for cafeteria deliveries, trash and utilities.

New Career & Technical Education (CTE)/Ag Shop & Audio Visual Laboratory 

  • New classrooms, interior workshop space, and office space

    • To include new interior restrooms

    • New classroom and workshop space to be expanded from existing capacity to accommodate varied program offerings as programs expand.

    • Programs affected by this facility will include:

      • Agriculture Food & Natural Resources

      • Audio Visual Technology & Communications

      • Law and Public Service

  • Paved exterior yard space for delivery and staging to workshop area

Restrooms/Concessions  

  • New group restroom & concessions building at exterior athletic facilities

    • Requires utilities extension to provide power and plumbing

  • Exterior site paving improvements to provide improved walking surfaces to and around new structure.

Re-sod New Football Field

  • Soil remediation and sod installation at new football field

  • Validation/troubleshooting and repair as needed for existing irrigation systems.

Perrin-Whitt CISD Site Plan

Site Map Key

Existing Building

Renovation

New Facility

Additional Bond Resources

Bond Flyer
Notice of Bond Election -English
Voter Information - English
Bond Presentation
Notice of Bond Election - Spanish
Order of Bond Election - English
Voter Information - Spanish
Bond Poster
Proposition - English & Spanish
Order of Bond Election - Spanish
Sample Ballot